Sea Gate Beach 4, Beach Filling Operations, Bulldozer

Worker laying slurry pipe for beach filling operations on Beach 4 with a bulldozer. In 1995 the Army Corps of Engineers began large scale sand replenishment along the length of the publicly-owned Coney Island beach. The privately owned Sea Gate beach was included because of adverse effects the filling was expected to have on the Sea Gate shoreline.